Full Electrification of Communal Heating and Domestic Hot Water
An interesting decarbonisation project undertaken by Zero Carbon Engineering in conjunction with Orion Building Engineering Services for a local authority in the Home Counties, involving the redevelopment of the communal heating infrastructure at a 48-apartment residential development constructed circa 1980.
This scheme did not lend itself to a hybrid system as there was no communal domestic hot water system, with each flat having its own DHW cylinder raising heat locally. The developed design provides a fully electrified solution, removing the reliance on natural gas for space heating and domestic hot water.
Engineering analysis and system sizing
A fundamental part of the design process was understanding the actual building heating demand rather than simply replacing the existing installed boiler capacity.
Existing gas boiler capacity of 360kW.
Calculated building heat loss of approximately 177kW.
Historical gas consumption of approximately 529,000kWh per annum.
Regression analysis of gas consumption against heating degree days, supporting a heating load of approximately 175kW.
Assessment of approximately 313kW of existing radiator capacity.
This analysis enabled the development of a correctly sized heat pump solution whilst retaining the existing radiator infrastructure.
The proposed low-carbon engineering solution incorporates:
A Clade Rowan R290 air source heat pump, delivering 360kW at +7°C and 240kW at -5°C external air temperature.
9,000 litres of thermal energy storage, comprising five 1,800-litre insulated vessels connected in series.
A 240kW plate heat exchanger providing hydraulic separation between the heat pump and existing heating distribution systems.
48 individual Heat Interface Units (HIUs), providing space heating and instantaneous domestic hot water to each apartment.
Removal of individual domestic hot water cylinders and cold water storage tanks.
Intelligent variable-speed pumping and pressure-independent control valves.
Individual apartment heat metering, providing the facility for future energy billing.
An open-protocol Building Management System (BMS), incorporating remote monitoring, energy metering and performance analysis.
A new 135kW electrical supply to support full electrification.
Thermal storage and system optimisation
The 9,000-litre thermal store is designed to provide approximately 26 minutes of thermal storage at 240kW output, reducing heat pump cycling and accommodating fluctuations in building demand.
Careful management of flow and return temperatures, thermal stratification and variable-speed pumping is central to optimising heat pump performance.
The use of R290, a natural refrigerant with a very low global warming potential, further supports the environmental objectives of the project.
Key design objectives:
Complete removal of natural gas consumption.
Reduced operational carbon emissions.
Retention and utilisation of existing radiator infrastructure.
Improved individual apartment heating and hot water control.
Reduced domestic water storage requirements.
Improved energy monitoring and operational visibility.
Long-term transition towards sustainable communal heating.
The design demonstrates how existing residential buildings can be transitioned towards fully electrified heating through detailed engineering analysis, appropriate plant sizing, thermal energy storage and intelligent system integration. From an operational viewpoint this delivered a 71% reduction in operational carbon but an 10% increase in energy costs.
Successful decarbonisation starts with understanding the building, not simply selecting the technology.